elektroenergetika
POWER SYSTEMS

NEWS

EVENTS
BOOKS

BLOG
UNIVERSITIES

NIKOLA TESLA
LINKS

CONTACT
elektroenergetika POWER

SYSTEMS
NEWS EEE < PREVIOUS EEE NEXT >

Apr 27, 2023 - How to fix clean energy’s storage problem

Apr 26, 2023 - Demand for electric vehicles growing, but can charging network keep up?

Apr 26, 2023 - California is Way Ahead of Electric Vehicle Goal

Apr 25, 2023 - Technologies that will take solar energy to a new level

Apr 25, 2023 - Why Are Floating Wind Turbines So Huge?

Apr 25, 2023 - India explores prospects of interconnecting power grid with Saudi Arabia & UAE

Apr 24, 2023 - LionLink: A vital step toward an integrated North Sea grid

Trending Now: Solar, Wind, Grid

Apr 24, 2023 - LionLink: A vital step toward an integrated North Sea grid



We’re developing a first-of-its-kind electricity link to connect offshore wind between the UK and the Netherlands. Designed together with our Dutch partners TenneT, LionLink (formerly known as EuroLink) is a multi-purpose interconnector (MPI) that can supply around 1.8 gigawatts of clean electricity, enough to power approximately 1.8 million homes.

What makes LionLink different?
Like a conventional point-to-point interconnector, LionLink will enable the cross border transmission of clean electricity via subsea cables. However, it’s called a Multi-Purpose Interconnector (MPI) because it will also connect to offshore wind farms. This means that instead of individual wind farms connecting one by one to the shore, MPIs such as LionLink, will allow clusters of offshore wind farms to connect all in one go, plugging into the energy systems of neighbouring countries. LionLink will be the first step in the journey to a more interconnected North Sea.