Work is nearing completion on the Victoria-NSW Interconnector upgrade Final testing is being carried out on six new SmartValve units installed at Yass substation. The technology redirects power off overloaded transmission lines onto lines with spare capacity, avoiding the need for new transmission VNI will allow more renewable energy to flow between Victoria, NSW and the ACT.