![]() POWER SYSTEMS |
![]() ![]() |
![]() ![]() |
![]() ![]() |
![]() ![]() |
![]() |
POWER SYSTEMS |
![]() |
HISTORY Early Years >>> AC/DC War of the Currents Harnessing Niagara Solar Energy Nuclear Energy
|
|
Early Years In 1881, two electricians built the world's first power system at Godalming in England. It was powered by two water wheels and produced an alternating current that in turn supplied seven Siemens arc lamps at 250 volts and 34 incandescent lamps at 40 volts. However, supply to the lamps was intermittent and in 1882 Thomas Edison and his company, Edison Electric Light Company, developed the first steam-powered electric power station on Pearl Street in New York City. The Pearl Street Station initially powered around 3,000 lamps for 59 customers. The power station generated direct current and operated at a single voltage. Direct current power could not be transformed easily or efficiently to the higher voltages necessary to minimize power loss during long-distance transmission, so the maximum economic distance between the generators and load was limited to around half a mile (800 m). That same year in London, Lucien Gaulard and John Dixon Gibbs demonstrated the "secondary generator"—the first transformer suitable for use in a real power system. The practical value of Gaulard and Gibbs' transformer was demonstrated in 1884 at Turin where the transformer was used to light up 40 kilometers (25 miles) of railway from a single alternating current generator. Despite the success of the system, the pair made some fundamental mistakes. Perhaps the most serious was connecting the primaries of the transformers in series so that active lamps would affect the brightness of other lamps further down the line. In 1885, Ottó Titusz Bláthy working with Károly Zipernowsky and Miksa Déri perfected the secondary generator of Gaulard and Gibbs, providing it with a closed iron core and its present name: the "transformer". The three engineers went on to present a power system at the National General Exhibition of Budapest that implemented the parallel AC distribution system proposed by a British scientist[a] in which several power transformers have their primary windings fed in parallel from a high-voltage distribution line. The system lit more than 1000 carbon filament lamps and operated successfully from May until November of that year. Also in 1885 George Westinghouse, an American entrepreneur, obtained the patent rights to the Gaulard-Gibbs transformer and imported a number of them along with a Siemens generator, and set his engineers to experimenting with them in hopes of improving them for use in a commercial power system. In 1886, one of Westinghouse's engineers, William Stanley, independently recognized the problem with connecting transformers in series as opposed to parallel and also realized that making the iron core of a transformer a fully enclosed loop would improve the voltage regulation of the secondary winding. Using this knowledge he built a multi-voltage transformer-based alternating-current power system serving multiple homes and businesses at Great Barrington, Massachusetts in 1886. The system was unreliable and short-lived, though, due primarily to generation issues. However, based on that system, Westinghouse would begin installing AC transformer systems in competition with the Edison Company later that year. In 1888, Westinghouse licensed Nikola Tesla's patents for a polyphase AC induction motor and transformer designs. Tesla consulted for a year at the Westinghouse Electric & Manufacturing Company's but it took a further four years for Westinghouse engineers to develop a workable polyphase motor and transmission system. By 1889, the electric power industry was flourishing, and power companies had built thousands of power systems (both direct and alternating current) in the United States and Europe. These networks were effectively dedicated to providing electric lighting. During this time the rivalry between Thomas Edison and George Westinghouse's companies had grown into a propaganda campaign over which form of transmission (direct or alternating current) was superior, a series of events known as the "war of the currents". In 1891, Westinghouse installed the first major power system that was designed to drive a 100 horsepower (75 kW) synchronous electric motor, not just provide electric lighting, at Telluride, Colorado. On the other side of the Atlantic, Mikhail Dolivo-Dobrovolsky and Charles Eugene Lancelot Brown, built the first long-distance (175 kilometers (109 miles)) high-voltage (15 kV, then a record) three-phase transmission line from Lauffen am Neckar to Frankfurt am Main for the Electrical Engineering Exhibition in Frankfurt, where power was used to light lamps and run a water pump. In the United States the AC/DC competition came to an end when Edison General Electric was taken over by their chief AC rival, the Thomson-Houston Electric Company, forming General Electric. In 1895, after a protracted decision-making process, alternating current was chosen as the transmission standard with Westinghouse building the Adams No. 1 generating station at Niagara Falls and General Electric building the three-phase alternating current power system to supply Buffalo at 11 kV. ![]() ![]() ![]() In the United Kingdom, Charles Merz, of the Merz & McLellan consulting partnership, built the Neptune Bank Power Station near Newcastle upon Tyne in 1901,and by 1912 had developed into the largest integrated power system in Europe.Merz was appointed head of a parliamentary committee and his findings led to the Williamson Report of 1918, which in turn created the Electricity (Supply) Act 1919. The bill was the first step towards an integrated electricity system. The Electricity (Supply) Act 1926 led to the setting up of the National Grid. The Central Electricity Board standardized the nation's electricity supply and established the first synchronized AC grid, running at 132 kilovolts and 50 hertz. This started operating as a national system, the National Grid, in 1938. In the United States in the 1920s, utilities formed joint-operations to share peak load coverage and backup power. In 1934, with the passage of the Public Utility Holding Company Act (USA), electric utilities were recognized as public goods of importance and were given outlined restrictions and regulatory oversight of their operations. The Energy Policy Act of 1992 required transmission line owners to allow electric generation companies open access to their network and led to a restructuring of how the electric industry operated in an effort to create competition in power generation. No longer were electric utilities built as vertical monopolies, where generation, transmission and distribution were handled by a single company. Now, the three stages could be split among various companies, in an effort to provide fair access to high voltage transmission.The Energy Policy Act of 2005 allowed incentives and loan guarantees for alternative energy production and advance innovative technologies that avoided greenhouse emissions. In France, electrification began in the 1900s, with 700 communes in 1919, and 36,528 in 1938. At the same time, these close networks began to interconnect: Paris in 1907 at 12 kV, the Pyrénées in 1923 at 150 kV, and finally almost all of the country interconnected by 1938 at 220 kV. In 1946, the grid was the world's most dense. That year the state nationalised the industry, by uniting the private companies as Électricité de France. The frequency was standardised at 50 Hz, and the 225 kV network replaced 110 kV and 120 kV. Since 1956, service voltage has been standardised at 220/380 V, replacing the previous 127/220 V. During the 1970s, the 400 kV network, the new European standard, was implemented. Developments in power systems continued beyond the nineteenth century. In 1936 the first experimental high voltage direct current (HVDC) line using mercury arc valves was built between Schenectady and Mechanicville, New York. HVDC had previously been achieved by series-connected direct current generators and motors (the Thury system) although this suffered from serious reliability issues. The first solid-state metal diode suitable for general power uses was developed by Ernst Presser at TeKaDe in 1928. It consisted of a layer of selenium applied on an aluminum plate. In 1957, a General Electric research group developed the first thyristor suitable for use in power applications, starting a revolution in power electronics. In that same year, Siemens demonstrated a solid-state rectifier, but it was not until the early 1970s that solid-state devices became the standard in HVDC, when GE emerged as one of the top suppliers of thyristor-based HVDC. In 1979, a European consortium including Siemens, Brown Boveri & Cie and AEG realized the record HVDC link from Cabora Bassa to Johannesburg, extending more than 1,420 kilometers (880 miles) that carried 1.9 GW at 533 kV. In recent times, many important developments have come from extending innovations in the information and communications technology (ICT) field to the power engineering field. For example, the development of computers mea
| |
|